Scotsman MC 45 Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Kostkarki do lodu Scotsman MC 45. MC-first half Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 136
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
TECHNICAL SERVICE TRAINING
TECHNICAL SERVICE TRAINING
Welcome to another
Welcome to another
Scotsman
Scotsman
technical
technical
service
service
presentation. This one will cover the MC
presentation. This one will cover the MC
Series Ice Cube Machines models
Series Ice Cube Machines models
MC 15, MC 45
MC 15, MC 45
and
and
MC 1210.
MC 1210.
MC SERIES
MC SERIES
CUBERS
CUBERS
Przeglądanie stron 0
1 2 3 4 5 6 ... 135 136

Podsumowanie treści

Strona 1 - MC SERIES

TECHNICAL SERVICE TRAININGTECHNICAL SERVICE TRAININGWelcome to anotherWelcome to another Scotsman Scotsman technical technical service service present

Strona 2 - MC 15 + B 350

MC SERIESMC SERIESTOPICSTOPICSOn the next slides are shown the following steps by stepsprocedures:•• UNPACKING UNPACKING•• INSTALLATION INSTALLATION••

Strona 3 - MC 45 + B 550

TERMINALBOARDTERMINALBOARDCONDENSERSENSOR SOCKETCONDENSERSENSOR SOCKETOPTICAL ICE LEVELCONTROLSENSORSOCKETOPTICAL ICE LEVELCONTROLSENSORSOCKETMICROPRO

Strona 4 - MC 1210 + B 120

SWITCH 9OPERATING TIMEOF WATER PUMPDURING HARVESTOFF = 15”ON = 30”SWITCH 9OPERATING TIMEOF WATER PUMPDURING HARVESTOFF = 15”ON = 30”SWITCH 7 AND 8EXTE

Strona 5

OPERATING PRINCIPLES - PC BOARDOPERATING PRINCIPLES - PC BOARDTime TTime T11From startup offreezingcycle till theblinking of0°C RedLEDMC SERIESMC SERI

Strona 6

OPERATING PRINCIPLES - PC BOARDOPERATING PRINCIPLES - PC BOARDTime TTime T22Fromblinking ofRed LEDtill the lightON steadyof -15°CRed LEDMC SERIESMC SE

Strona 7

OPERATING PRINCIPLES - PC BOARDOPERATING PRINCIPLES - PC BOARDTime TTime TaaAdded time controlled bythe PC Board accordingto the setting of the DIPSWI

Strona 8

OPERATING PRINCIPLES - PC BOARDOPERATING PRINCIPLES - PC BOARDTime TTime TssHarvest Time TS iscontrolled by the PCBoard and it is inverselyproportiona

Strona 9

START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSIt’s possible to extend the length of the harvest cycle (Te) bymeans of the DIP SWITCH 7

Strona 10

OPERATING PRINCIPLES - PC BOARDOPERATING PRINCIPLES - PC BOARDTime TTime TaaTime TTime T11+T+T22TimeTimeTTssFreezing = TFreezing = T11 + T + T22 + +

Strona 11 - UNPACKING

OPERATING PRINCIPLES - ALARMOPERATING PRINCIPLES - ALARMWhenever thecondensing temperaturerise up to 70ºC (aircooled version) or 60ºC(water cooled ver

Strona 12

OPERATING PRINCIPLES - ALARMOPERATING PRINCIPLES - ALARMIn case the evaporatingtemperature remainshigher then 0ºC after 15minutes from thebeginning of

Strona 13

UNPACKINGUNPACKINGUNPACKINGMC SERIESMC SERIES

Strona 14

OPERATING PRINCIPLES - ALARMOPERATING PRINCIPLES - ALARMIn case both theRed and YellowLED are lightON steady thecondenser sensor isout of order andnee

Strona 15

OPERATING PRINCIPLES - ALARMOPERATING PRINCIPLES - ALARMIn case both theRed and YellowLED areblinking theevaporator sensoris out of order andneed to b

Strona 16

OPERATING PRINCIPLES - BIN FULLOPERATING PRINCIPLES - BIN FULLAs soon as theice cubes are inbetween thetransmitter andreceiver sensorof the OpticalIce

Strona 17

OPERATING PRINCIPLES - BIN FULLOPERATING PRINCIPLES - BIN FULL….immediatelythe Bin FullYellow LEDstarts to blinkand after…..FREEZING CYCLEBIN FULLPOWE

Strona 18

OPERATING PRINCIPLES - BIN FULLOPERATING PRINCIPLES - BIN FULL….one minutethe PC Boardswitch OFF theentire machinewith the lightON of BINFULL YellowLE

Strona 19 - INSTALLATION

OPERATING PRINCIPLES - BIN FULLOPERATING PRINCIPLES - BIN FULLWhen ice isscooped outfrom thestorage bin….MC SERIESMC SERIES

Strona 20

OPERATING PRINCIPLES - BIN FULLOPERATING PRINCIPLES - BIN FULL…. after six-sevenseconds the machinerestart in theoperation from thebeginning of thefre

Strona 21

OPERATING PRINCIPLES - BIN FULLOPERATING PRINCIPLES - BIN FULL….….or from theharvest cycle whenthe evaporatingtemperature isbelow 0ºC in orderto avoid

Strona 22

OPERATING PRINCIPLES - POWER OFFOPERATING PRINCIPLES - POWER OFFIn case of black out in power the machine re-starts (when poweris back) through the 5

Strona 23

OPERATING PRINCIPLES - POWER OFFOPERATING PRINCIPLES - POWER OFFIn case of black out in power the machine re-starts (when poweris back) through the 5

Strona 24

MC SERIESMC SERIESUNPACKINGUNPACKINGThe machines are suppliedin a carton box secured bytwo plastic strips to awooden base. Check firstthe outside cond

Strona 25

MC SERIESMC SERIESThe components of the refrigerantsystem of the MC series Models arecomposed by:••COMPRESSORCOMPRESSORLOCATION OF REFRIGERANT COMPONE

Strona 26

MC SERIESMC SERIES• COMPRESSOR••CONDENSERCONDENSERLOCATION OF REFRIGERANT COMPONENTSLOCATION OF REFRIGERANT COMPONENTSCOMPONENTS - REFRIGERANT SYSTEMC

Strona 27

MC SERIESMC SERIESLOCATION OF REFRIGERANT COMPONENTSLOCATION OF REFRIGERANT COMPONENTSCOMPONENTS - REFRIGERANT SYSTEMCOMPONENTS - REFRIGERANT SYSTEM•

Strona 28

MC SERIESMC SERIES• COMPRESSOR• CONDENSER• EVAPORATOR••SUCTION LINE ANDSUCTION LINE ANDCAPILLARY TUBECAPILLARY TUBELOCATION OF REFRIGERANT COMPONENTSL

Strona 29

MC SERIESMC SERIES• COMPRESSOR• CONDENSER• EVAPORATOR• SUCTION LINE ANDCAPILLARY TUBE••DRIERDRIERLOCATION OF REFRIGERANT COMPONENTSLOCATION OF REFRIGE

Strona 30

MC SERIESMC SERIES• COMPRESSOR• CONDENSER• EVAPORATOR• SUCTION LINE AND CAPILLARYTUBE• DRIER••HOT GAS VALVEHOT GAS VALVELOCATION OF REFRIGERANT COMPON

Strona 31

MC SERIESMC SERIESCOMPONENTS - WATER SYSTEMCOMPONENTS - WATER SYSTEMThe components of the water systemof the MC Series Models arecomposed by:•• WATER

Strona 32

MC SERIESMC SERIES• WATER INLET VALVE•• WATER SUMPWATER SUMPCOMPONENTS - WATER SYSTEMCOMPONENTS - WATER SYSTEM

Strona 33

MC SERIESMC SERIES• WATER INLET VALVE• WATER SUMP•• WATER PUMPWATER PUMPCOMPONENTS - WATER SYSTEMCOMPONENTS - WATER SYSTEM

Strona 34 - MC 15-45

MC SERIESMC SERIES• WATER INLETVALVE• WATER SUMP• WATER PUMP•• SPRAY BARSPRAY BARCOMPONENTS - WATER SYSTEMCOMPONENTS - WATER SYSTEM

Strona 35

MC SERIESMC SERIESUNPACKINGUNPACKINGVisuallyinspect theexterior of themachine thenremove thetwo sidepanels……………..and thevertical icechute…..

Strona 36

MC SERIESMC SERIES• WATER INLETVALVE• WATER SUMP• WATER PUMP• SPRAY BAR•• OVERFLOWOVERFLOWCOMPONENTS - WATER SYSTEMCOMPONENTS - WATER SYSTEM

Strona 37 - COLD AIR

MC SERIESMC SERIES• WATER INLETVALVE• WATER SUMP• WATER PUMP• SPRAY BAR• OVERFLOW•• WATER DRAINWATER DRAINVALVEVALVECOMPONENTS - WATER SYSTEMCOMPONEN

Strona 38 - MC 15 + MC 45

MC SERIESMC SERIESCOMPONENTS - ELECTRONIC CONTROLSCOMPONENTS - ELECTRONIC CONTROLSThe components ofthe ElectronicSystem of the MCSeries Models arecomp

Strona 39

MC SERIESMC SERIESCOMPONENTS - ELECTRONIC CONTROLSCOMPONENTS - ELECTRONIC CONTROLS• PC BOARD••EVAPORATOREVAPORATORSENSORSENSOR

Strona 40

MC SERIESMC SERIESCOMPONENTS - ELECTRONIC CONTROLSCOMPONENTS - ELECTRONIC CONTROLS• PC BOARD• EVAPORATORSENSOR••CONDENSERCONDENSERSENSORSENSOR

Strona 41

MC SERIESMC SERIESCOMPONENTS - ELECTRONIC CONTROLSCOMPONENTS - ELECTRONIC CONTROLS• PC BOARD• EVAPORATORSENSOR• CONDENSERSENSOR••OPTICAL ICEOPTICAL IC

Strona 42

END FIRSTEND FIRSTHALFHALFMC SERIESMC SERIES

Strona 43

MC SERIESMC SERIESUNPACKINGUNPACKING…..unscrewthe unit framefrom thewoodenbase….

Strona 44

MC SERIESMC SERIESUNPACKINGUNPACKING…..then removefrom the inside ofthe machine all thepolystyreneprotection as wellas the….…..the Optical IceLevel Co

Strona 45 - STACKING INSTALLATION

MC SERIESMC SERIESUNPACKINGUNPACKINGThe Modular Cubermachines require for theinstallation the use of acompanion storage binto store the iceproduced.St

Strona 46

MC SERIESMC SERIESUNPACKINGUNPACKINGUnpack thestorage bin andvisually inspectthe exterior thenremove fromthe inside thecarton boxcontaining theplastic

Strona 47

MC SERIESMC SERIESUNPACKINGUNPACKINGUnloose the two screws holdingthe drain fitting protection andremove it

Strona 48

INSTALLATIONINSTALLATIONINSTALLATIONMC SERIESMC SERIES

Strona 49

MC 15 + B 350MC 15 + B 350

Strona 50

MC SERIESMC SERIESInstall the fourlegs sockets onthe bottom baseof the storage binas well as themetal legs.INSTALLATIONINSTALLATION

Strona 51

MC SERIESMC SERIESPlace the storage binin its definitivelocation then installon top of the same theice machine.INSTALLATIONINSTALLATION

Strona 52

MC SERIESMC SERIESPlacebetweenthemachineand thestorage binthe metalbracket ofthe IceLevelControl.INSTALLATIONINSTALLATION

Strona 53

MC SERIESMC SERIESSecure themachine tothe storagebin by meansof the twoscrewssupplied.INSTALLATIONINSTALLATION

Strona 54

MC SERIESMC SERIESInsert thetwo plasticclips into thetwo squareholes of theS.S. bracketthen ….INSTALLATIONINSTALLATION

Strona 55

MC SERIESMC SERIES……cut the plastic stripsecuring the Optical IceLevel Control to the suctionline of the machine.INSTALLATIONINSTALLATION

Strona 56

MC SERIESMC SERIESCut the rubber pluglocated on the right side ofthe ice chute rectangularopening then….INSTALLATIONINSTALLATION

Strona 57

MC SERIESMC SERIES…..drive downinto the storagebin the OpticalIce Level Controland secure it withthe two screwssupplied with themachine.INSTALLATIONIN

Strona 58

MC SERIESMC SERIESInstall on theupper front sideof the Ice Chuterectangularopening the IceCubes plasticdeflectorsupplied withthe storage binpay attent

Strona 59

MC SERIESMC SERIES….. properlyhook it onthe frontedge.INSTALLATIONINSTALLATION

Strona 60

MC 45 + B 550MC 45 + B 550

Strona 61

MC SERIESMC SERIESInstall againthe verticalice chutewith itscover…..INSTALLATIONINSTALLATION

Strona 62

MC SERIESMC SERIES….. payingattention tohook it on theupper side ofthe evaporatoropening .INSTALLATIONINSTALLATION

Strona 63

MC SERIESMC SERIESINSTALLATIONINSTALLATIONCheck the data plateof the machinelocated on the rearpanel for correctvoltage as well as forthe proper wirin

Strona 64

MC SERIESMC SERIESINSTALLATIONINSTALLATIONCheck for the correct water and ambient conditions that should be:• Min. ambient temperature 10ºC (50F)• Max

Strona 65

MC 15-45MC 15-45INSTALLATIONINSTALLATIONAdequatespace must leftbe for properwater andelectricalconnections onthe rear side ofthe machine. Aminimumclea

Strona 66

COLD AIRCOLD AIRHOT AIRHOT AIRINSTALLATION - AIR CIRCULATIONINSTALLATION - AIR CIRCULATIONCONDENSERFAN MOTORCOMPRESSORICE CHUTEOPENINGMC 15-45MC 15-45

Strona 67

MC 1210MC 1210INSTALLATIONINSTALLATIONAdequate spacemust be left forproper water andelectricalconnections onthe rear side ofthe machine aswell as for

Strona 68

COLD AIRCOLD AIRHOT AIRHOT AIRINSTALLATION - AIR CIRCULATIONINSTALLATION - AIR CIRCULATIONCOMPRESSORCOMPRESSORFAN MOTORCONDENSERICE CHUTEOPENINGICE CH

Strona 69

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATION

Strona 70

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATIONFor the Stakinginstallation aproper kit - KSC11 - is required.It consists of:• Ice

Strona 71

MC 1210 + B 120MC 1210 + B 120

Strona 72

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATION• Ice connecting chute/s• Interface PC Boardsmade by SYEN…….. and by Pro.El.Ind.

Strona 73

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATION• Ice connecting chute/s• Interface PC Board• Gasket

Strona 74

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATION• Ice connecting chute/s• Interface PC Board• Gasket• Extension optical cable

Strona 75

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATIONThe Ice connectingchute/s must be installedthrough the bottomrectangular opening o

Strona 76

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATIONThe Interface PCBoard must beinstalled in the bottommachine. The OpticalIce Level

Strona 77

STACKING INSTALLATIONSTACKING INSTALLATIONICE LEVELCONTROLICE LEVELCONTROLMAIN PCBOARDMAIN PCBOARDINTERFACEPC BOARDINTERFACEPC BOARDMAIN PCBOARDMAIN P

Strona 78

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATIONATTENTION!!!It is IMPERATIVE that all the three PC Boards (Ice Machines ones + the

Strona 79

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATIONThe gaskets must beinstalled in the spaceremaining between thebottom base of theup

Strona 80

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATIONThe Extension cable must be usedonly when a current Electronicmachine is installed

Strona 81

MC SERIESMC SERIESINSTALLATIONINSTALLATIONLevel the unit on bothdirections front torear and right to leftside using theadjustable legs.

Strona 82

MC SERIESMC SERIESTOPICSTOPICSOn the next slides are shown the following steps by stepsprocedures:•• UNPACKINGUNPACKING•• INSTALLATION INSTALLATION••

Strona 83

MC SERIESMC SERIESINSTALLATION - ELECTRICALINSTALLATION - ELECTRICALInstall, on the cable supplywith the machine, anadaguate electrical plugaccording

Strona 84

MC SERIESMC SERIESINSTALLATION - WATER ININSTALLATION - WATER INConnect the water inlet 3/4”male threat of the water inletsolenoid valve to the waters

Strona 85

MC SERIESMC SERIESINSTALLATION - WATER DRAININSTALLATION - WATER DRAINConnect the 20 mm O.D. fitting (2on model MC 45) of the waterdrain with the flex

Strona 86

MC SERIESMC SERIESTYPICAL INSTALLATIONTYPICAL INSTALLATIONPOWERWATER INLETWATER DRAINHAND DISCONNECTSWITCHWATERFILTERWATERVALVEWATER DRAINAIR COOLEDAI

Strona 87

MC SERIESMC SERIESINSTALLATION - WATER ININSTALLATION - WATER INOn the water cooledversion there is aseparate 3/4” malethread water inlet fittingconne

Strona 88

MC SERIESMC SERIESINSTALLATION - WATER OUTINSTALLATION - WATER OUT…..a second separate drainhose must be connected tothe outlet 3/4” male fittinglocat

Strona 89

MC SERIESMC SERIESTYPICAL INSTALLATIONTYPICAL INSTALLATIONPOWERWATER INLETWATER DRAINHAND DISCONNECTSWITCHWATERFILTERWATERVALVEWATER DRAINWATER COOLED

Strona 90

START UP ANDOPERATIONALCHECKSSTART UP ANDSTART UP ANDOPERATIONALOPERATIONALCHECKSCHECKSMC SERIESMC SERIES

Strona 91

• Open the water tap/valve. • Switch ON the power on theelectrical supply line.START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSMC SERIES

Strona 92

START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSMC SERIESMC SERIESThe Ice Machine will start up automatically through the 5 minutes“Wate

Strona 93

MC SERIESMC SERIESTOPICSTOPICSOn the next slides are shown the following steps by stepsprocedures:•• UNPACKING UNPACKING•• INSTALLATIONINSTALLATION••

Strona 94

The components energizedduring the first 5’ are:• PC BoardPC BoardSTART UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSMC SERIESMC SERIES

Strona 95

START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSThe components energized duringthe first 5’ are:• PC Board• Water Inlet Solenoid ValveWa

Strona 96

START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSThe components energizedduring the first 5’ are:•PC Board• Water Inlet SolenoidValve••Wa

Strona 97

The components energizedduring the first 5’ are:• PC Board• Water Inlet Solenoid Valve• Water Drain/PurgeSolenoid Valve• Hot Gas SolenoidHot Gas Solen

Strona 98

During the first 5’ the watergoes through the Water InletValve then….….flows into the small orificeof the “Flow Control” locatedon the outlet port of

Strona 99

Following the copper inlet tubethe incoming water arrive on theupper side of the evaporator…... where it flows onto the plasticevaporator platen dri

Strona 100

Dribbled water iscollected down intothe water sumpwhere is locatedthe overflow standpipe that assuresthe proper waterlevel and quantityfor the nextfre

Strona 101

After the first 5’ of water fillingphase the machine start upautomatically on freezing cyclewith the following electricalcomponents in operation:• Com

Strona 102

• Compressor• Water PumpSTART UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSMC SERIESMC SERIES

Strona 103

• Compressor• Water Pump• Fan Motor (on air cooledversion only)START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSMC SERIESMC SERIES

Strona 104

MC SERIESMC SERIESTOPICSTOPICSOn the next slides are shown the following steps by stepsprocedures:•• UNPACKING UNPACKING•• INSTALLATION INSTALLATION••

Strona 105

START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKS• Compressor• Water Pump• Fan Motor (on air cooledversion only)•ContactorMC SERIESMC SE

Strona 106

The operation of thefan motor is controlledby a condensertemperature sensorlocated within the finsof condenser thattransmit a signal to thePC Board

Strona 107

On PC Board the LED energized are:• PowerSTART UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSFREEZING CYCLEBIN FULLPOWERTOO HI EVAP TEMPTOO

Strona 108

On PC Board the LED energized are:• Power• FreezingSTART UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSFREEZING CYCLEBIN FULLPOWERTOO HI EVA

Strona 109

Water iscirculating bythe water pumpinto the invertedtin plated coppermolds of theevaporator….START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL

Strona 110

START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKS….while therefrigerant isflowing intothe serpentinewelded on theupper side ofthe tin pla

Strona 111

Afterapproximately 5minutes after thestart up of thefreezing cycle, thetemperature of theevaporatorserpentine dropsdown to 0ºC….START UP AND OPERATION

Strona 112

….with the blinking of the small RED LED located in the center ofPC Board.START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSMC SERIESMC SE

Strona 113

Approximately 5minutes thetemperature of theevaporatorserpentine dropsdown to - 15ºC….START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKS-1

Strona 114

….with the light ON steady of the small RED LED located in thecenter of PC Board.START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSMC SERI

Strona 115

MC SERIESMC SERIESTOPICSTOPICSOn the next slides are shown the following steps by stepsprocedures:•• UNPACKING UNPACKING•• INSTALLATION INSTALLATION••

Strona 116

The machine remains inthe freezing cycle till itscompletion for anadditional timeaccording to the set up ofthe first four DIPSWITCH of the PCBoard.STA

Strona 117

Once completed the freezing cyclethe machine enters into thedefrost or harvest cycle with thefollowing electrical componentsin operation:••CompressorC

Strona 118

• Compressor••Water Inlet Solenoid valveWater Inlet Solenoid valveSTART UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSMC SERIESMC SERIES

Strona 119

• Compressor• Water Inlet Solenoidvalve••Water Drain/PurgeWater Drain/PurgeSolenoid ValveSolenoid ValveSTART UP AND OPERATIONAL CHECKSSTART UP AND OPE

Strona 120

• Compressor• Water Inlet Solenoid valve• Water Drain/Purge SolenoidValve••Hot Gas ValveHot Gas ValveSTART UP AND OPERATIONAL CHECKSSTART UP AND OPERA

Strona 121

According to the setting ofthe DIP SWITCH no 9 theWater Pump can remain inoperation to discharge thewater not used on theprevious freezing cycleduring

Strona 122

….15” of theharvest cycle whenthe DIP SWITCH isin OFF position or30” when in ONposition.START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKS

Strona 123

START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSThe length of thedefrost or harvestcycle iscontrolled by thePC Boardaccording to thesett

Strona 124

START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKS…..the time that themachine takes to dropthe evaporatingtemperature from 0ºCto -15ºC (ti

Strona 125

START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSIt’s possible to extend the length of the defrost cycle by means ofthe DIP SWITCH 7 and

Strona 126

MC SERIESMC SERIESTOPICSTOPICSOn the next slides are shown the following steps by stepsprocedures:•• UNPACKING UNPACKING•• INSTALLATION INSTALLATION••

Strona 127

During the defrostor harvest cyclethe combinedaction ofrefrigerant in HotGas state andincoming Waterare going topartially melt theice cubes incontact

Strona 128

Holding anhand full ofice cubesbetween theI/R OpticalIce LevelSensor duringthe defrostcycle it ispossible totest itsoperation.START UP AND OPERATIONAL

Strona 129

The Bin Full YELLOW LED starts to blink.START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSFREEZING CYCLEBIN FULLPOWERTOO HI EVAP TEMPTOO H

Strona 130

After 1 minute of continuous interruption of the infrared beam betweentransmitter and received (Bin Full YELLOW LED always blinking) themachine switch

Strona 131

OPERATINGPRINCIPLESandCOMPONENTSOPERATINGOPERATINGPRINCIPLESPRINCIPLESandandCOMPONENTSCOMPONENTSMC SERIESMC SERIES

Strona 132

OPERATING PRINCIPLES - FREEZEOPERATING PRINCIPLES - FREEZECompressorCompressorEvaporatorEvaporatorAir cooledAir cooledcondensercondenserHotHotgasgasva

Strona 133

OPERATING PRINCIPLES - HARVESTOPERATING PRINCIPLES - HARVESTCompressorCompressorEvaporatorEvaporatorAir cooledAir cooledcondensercondenserHotHotgasgas

Strona 134

MC SERIESMC SERIESWATER SYSTEM - FREEZEWATER SYSTEM - FREEZE

Strona 135

MC SERIESMC SERIESWATER SYSTEM - HARVESTWATER SYSTEM - HARVESTFIRST PORTION 30”FIRST PORTION 30”

Strona 136 - END FIRST

MC SERIESMC SERIESWATER SYSTEM - HARVESTWATER SYSTEM - HARVESTSECOND PORTIONSECOND PORTION

Komentarze do niniejszej Instrukcji

Brak uwag